Success Stories


LARGE RAILROAD
This job required the remediation of contaminated soil beneath track and rock ballast. Note the TPH decrease over a period of 49 days. Desert conditions required our Team to use special procedures.


AIRCRAFT MANUFACTURER
The following results are from PCB and TPH contaminated soil in Dallas. There is no detectable PCB left in the soil at all.


STATE OF NEW YORK
The floor of a New York electrical vault had become highly contaminated with various PCB’s. Even though the contamination was not treated for the first 38 days impressive results were still possible using our products.