|
Success Stories
LARGE RAILROAD
This job required the remediation of
contaminated soil beneath track and rock ballast.
Note the TPH decrease over a period of 49 days.
Desert conditions required our
Team to use special procedures.

AIRCRAFT MANUFACTURER
The following results are from PCB and
TPH contaminated soil in Dallas. There is no
detectable PCB left in the soil at all.
 
STATE OF NEW YORK
The floor of a New York electrical vault
had become highly contaminated with various
PCB’s. Even though the contamination was not
treated for the first 38 days impressive
results were still possible using our
products.

|